바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

 

Estimation of Unit Maintenance Costs by Tunnel Construction Methods Using XGBoost

Author

Lee, S., Nam, Y., Shin, B., Lee, T. and Chi, S.*

Journal

Journal of Construction Automation and Robotics

Published

2025.09.

DOI

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.